India's one of the highest-rated legal tax and compliance guidance platform.
4.9 out of 5
(8521+ ratings)
Verified
Siddhu ManojFounder & CEO of Two-LYP Computations Pvt. Ltd.
“Incorporating my Startup with IncorpX was an incredibly smooth and hassle-free experience. The team was highly professional, guiding us every step of the way with clear communication and prompt support. The registration process was fast, and every detail was handled with precision and accuracy. Highly recommend IncorpX for anyone starting a business.”
Abhishek LohaniDirector at Lohani Learnings
“Company is good and service is also smooth. I used their compliance service and the response was timely with no delay and price are also convenient. They are always available to cater your need.”
Chandan Kr. ChaudharyFounder of Creative Minds
“I am very satisfied with the team of IncorpX for providing the top notch services. Team of IncorpX was giving the update on daily basis was one of the best thing which I experience in Corporate. keep doing it. Thank you!”
Jayavijaya SJFounder of Agro Farms
“Don't think twice.Got my company incorporates here. Tbh very impressed by the quality of service provided by this team. Very organized and friendly team. Had a smooth and peaceful experience. Timely regular updates were provided by the team. Overall a great experience.”
Anoop KrishnanFounder of EIGHTH DAY FORGE
“It's rare to find a service provider who makes the process feel personal - IncorpX absolutely did. From day one, they patiently explained every detail without any jargon, making it easy to understand and stress-free. There was zero chasing, no delays-just efficient, smooth execution all the way through. I felt supported, heard, and confident at every step of registering my company EIGHTH DAY FORGE (OPC) Private Limited. Thanks to Mr. Sriram and his wonderful team.”
Ramesh LankeFounder of EKnal Technologies
“IncorpX made the entire registration process for our company, EKnal Technologies, smooth and stress-free. Their team was professional, efficient, and incredibly supportive from start to finish. Highly recommend them to any founder looking for a reliable partner in their business journey! Special shoutout to Sriram and Aswin-your support, clarity, and responsiveness made the whole process incredibly smooth.”
660+
Businesses Incorporated Every Month
1068+
Ratings Trusted by 2172+ Clients
275+
Expert Partners Nationwide
Why Choose Us
Why Choose Us?
Expert Legal Team
Experienced legal experts in company formation and corporate law.
Fast Turnaround
Kickstart your venture with efficient company setup, generally processed within a week.
Dedicated Support
Personal manager by your side, every step of the way and beyond.
Complete Documentation
We handle all paperwork and ensure full legal compliance.
Business Growth Tools
Free business resources to fuel your company's success from day one.
24/7 Customer Service
Round-the-clock assistance for all your concerns.
Get Your Factory Plan Approved in Bhubaneswar Today!?
Factory Plan Approval under Section 6 of the Factories Act is mandatory before constructing or extending any factory building. Don't risk penalties and demolition orders - get your plans approved today!
Simple Process
Here's How It Works
01
Fill the Form
Simply fill the above form to get started.
02
Call to discuss
Our startup expert will connect with you & complete legalities.
03
Get Your Factory Plan Approval Done
Our factory compliance experts coordinate the complete Factory Plan Approval process - from architect engagement to Chief Inspector approval. Quick and hassle-free.
Pricing
Simple & Transparent Pricing
MOST POPULAR
Factory Plan Approval Package in Bhubaneswar
From ₹14999 one-time professional fee
Get incorporated in 5 days
Quick 5-day delivery Satisfaction assured
Free Consultation
Architect Coordination
Plan Compliance Review
NOC Procurement Support
Application Filing
Chief Inspector Submission
Inspection Coordination
Query Resolution
Approval Certificate
Factory License Guidance
*Statutory charges applicable as per government norms
4.9/5 based on 1068+ reviews
Money back guarantee
Safe transactions
5-star service
AI-Powered Platform
Meet IncorpX Nova
Our proprietary AI engine streamlines every step of business setup, from intelligent name suggestions to automated document drafting and compliance tracking.
AI-Powered Business Name Approval Check
Auto-Generated MoA & AoA Drafts
Real-Time Compliance Monitoring
3x Faster Processing Than Traditional CAs
24/7 AI Chatbot + Human Expert Support
NOVA AI
Premium Plan
IncorpX Prime
Comprehensive business registration package with priority processing and expert guidance at every step.
Key Benefits
Priority handling by senior registration experts.
Documentation completed in 1 business days.
Anytime access to our support team.
Important Notes
We strive to register your preferred business name whenever feasible.
Alternative name suggestions are provided if the preferred name is not approved.
Factory Plan Approval is a mandatory statutory requirement under Section 6 of the Factories Act, 1948 that must be obtained before constructing, extending, or making structural alterations to any factory building. The approval ensures that the proposed factory layout meets all prescribed health, safety, and welfare standards for workers as mandated by the Act and the National Building Code of India (NBC).
The Factories Act, 1948 dedicates extensive provisions under Sections 11 to 20 to the health and welfare of factory workers - covering cleanliness, ventilation, temperature control, dust and fume prevention, overcrowding, lighting, drinking water, latrines, urinals, and spittoons. The Factory Plan must demonstrate compliance with each of these statutory requirements before the Chief Inspector of Factories grants approval for construction.
The National Building Code (NBC) supplements the Factories Act by laying down detailed technical specifications for factory buildings, including structural stability, fire safety, electrical installations, plumbing, and accessibility. Every factory plan must conform to both the Factories Act provisions and the applicable NBC standards to receive approval from the competent authority.
At IncorpX, we provide end-to-end Factory Plan Approval services across India. Our team coordinates with licensed architects, structural engineers, and the Chief Inspector's office to prepare compliant plans, procure necessary NOCs, and secure approval - ensuring a smooth, hassle-free experience for factory owners and promoters.
The approval process in Bhubaneswar involves submission of detailed architectural drawings, structural stability certificates, fire safety plans, and environmental clearances to the State Factory Inspectorate. The Chief Inspector examines these plans against the statutory checklist and, upon satisfaction, issues the approval certificate that authorises commencement of factory construction. Any deviation from approved plans during construction is a punishable offence.
It is important to note that Factory Plan Approval is distinct from a building construction permit issued by the local municipal authority. While both may be required, Factory Plan Approval specifically evaluates the factory's compliance with industrial health and safety provisions under the Factories Act - including worker welfare facilities, hazardous process safeguards, and manufacturing-specific requirements that go beyond standard building regulations.
What is Factory Plan Approval?
Factory Plan Approval is the formal sanction granted by the Chief Inspector of Factories (or the State Factory Inspectorate) under Section 6 of the Factories Act, 1948, authorizing the construction, extension, or structural modification of a factory building. No person shall construct, extend, or take into use any building as a factory without prior written approval of the plans and specifications by the competent authority.
The plans must be prepared by a licensed architect or registered structural engineer and must include site plans, building plans, machinery layout plans, ventilation plans, fire escape plans, and drainage plans - all drawn to prescribed scales. The plans must clearly demonstrate compliance with the health, safety, and welfare provisions of the Factories Act and the National Building Code.
Factory Plan Approval is a prerequisite for obtaining a Factory License under Section 6(1) of the Act. Without an approved factory plan, the State Government cannot issue a Factory License, and the factory cannot legally commence manufacturing operations. The approval is typically valid for 2-3 years, within which construction must be completed and the Factory License obtained.
The approval applies to all premises that qualify as a "factory" under Section 2(m) of the Factories Act - any premises where ten or more workers are employed with power-driven machinery, or twenty or more workers without power-driven machinery. This includes manufacturing plants, processing units, assembly facilities, warehousing with mechanical handling, and any establishment engaged in a manufacturing process.
In Bhubaneswar, the Factory Plan Approval process is administered by the State Factory Inspectorate under the Department of Labour. Applicants must submit detailed plans through the prescribed portal along with all supporting NOCs, certificates, and government fees. The Chief Inspector's technical team evaluates each plan against the statutory checklist before granting or rejecting the application.
Key Aspects of Factory Plan Approval:
Statutory Requirement:
Mandated under Section 6 of the Factories Act, 1948 - no factory construction can begin without it.
Health & Safety Compliance:
Plans must comply with Sections 11-20 covering ventilation, lighting, sanitation, and worker safety.
NBC Standards:
Building plans must conform to National Building Code specifications for structural stability and fire safety.
Time-Bound Validity:
Approval is valid for 2-3 years, within which construction must be completed and Factory License obtained.
Did You Know?
Constructing or operating a factory without an approved plan is a serious offence under the Factories Act. First-time offenders face fines up to ₹2,00,000, and repeat offenders can be imprisoned for up to 2 years with fines up to ₹5,00,000. Municipal authorities can also order demolition of unauthorized factory structures.
Who Needs Factory Plan Approval in Bhubaneswar?
Factory Plan Approval is required by any person or entity proposing to construct, extend, or structurally modify a premises that qualifies as a "factory" under the Factories Act, 1948. The following establishments in Bhubaneswar must obtain approval:
Any premises employing 10+ workers with power-driven machinery in a manufacturing process
Any premises employing 20+ workers without power-driven machinery in a manufacturing process
Existing factories planning construction of new buildings or additional floors
Factories planning extension of existing buildings beyond the approved plan
Conversion of any commercial or residential building into a factory premises
Factories installing new machinery that requires structural modifications
Factories involved in hazardous processes requiring additional safety infrastructure
Industrial units in SEZs, industrial estates, and notified industrial areas
Technical Requirements for Factory Plans in Bhubaneswar:
Factory Plans submitted for approval must meet specific technical requirements prescribed under the Factories Act and the National Building Code. These ensure the health, safety, and welfare of workers employed in the factory.
The Chief Inspector of Factories evaluates every submitted plan against these technical benchmarks. Non-compliance with any of the following requirements will result in rejection of the application or a requirement for plan revisions before approval can be granted.
Requirement Area
Specification
Legal Provision
Minimum Room Height
4.2 metres from floor to lowest point of ceiling
Section 14 - Prevention of overcrowding
Floor Space per Worker
9.9 cubic metres of space per worker
Section 16 - Overcrowding prevention
Natural Lighting
Glazed window area not less than 1/6th of the floor area
Section 17 - Lighting requirements
Ventilation Openings
Minimum 15% of the floor area for natural ventilation
Section 13 - Ventilation & temperature
Fire Safety Exits
Minimum 2 exits on opposite sides; width ≥ 1.0 metre each
Section 38 - Fire safety provisions
Sanitary Facilities
Separate latrines & urinals for male and female workers as per prescribed ratios
Sections 19 & 20 - Latrines, urinals & spittoons
Machinery Spacing
Minimum 1.0 metre clearance around machinery for safe operation and maintenance
Section 21 - Fencing of machinery
Structural Stability
Certified by licensed structural engineer; must withstand prescribed load factors
National Building Code - Part 6
Note: These are minimum requirements. Factories dealing with hazardous processes (as defined under Section 2(cb) of the Factories Act) must meet additional requirements including emergency planning, on-site disaster management facilities, and safety officer provisions. Consult our experts for process-specific requirement details.
Types of Factory Plans Required in Bhubaneswar:
A complete Factory Plan Approval application requires multiple plan types, each serving a specific regulatory purpose. All plans must be prepared by a licensed architect to prescribed scales and specifications.
The Chief Inspector requires each plan type to demonstrate compliance with different provisions of the Factories Act. Submitting an incomplete set of plans is the most common reason for application rejection - ensure all six plan types are included in your submission.
Plan Type
Scale
Key Details
Applicable Provisions
Site Plan
1:500
Shows boundaries, roads, adjoining properties, setbacks, open spaces, and approach roads
Section 38 - Fire safety; NBC Part 4 Fire & Life Safety
Drainage Plan
1:200
Effluent disposal, sewage system, trade waste treatment, storm water drainage
Section 12 - Disposal of wastes & effluents; NBC Part 9
Important Note!
All factory plans must be prepared and signed by a licensed architect or registered structural engineer holding a valid Council of Architecture registration. Plans submitted without proper architect credentials will be rejected by the Chief Inspector's office.
Step-by-Step Process for Factory Plan Approval in Bhubaneswar:
Factory Plan Approval follows a structured process involving licensed professionals and the Chief Inspector of Factories. At IncorpX, we manage the entire process on your behalf. Here's the step-by-step procedure:
Step 1: Engage a Licensed Architect
Appoint a licensed architect or registered structural engineer who holds a valid Council of Architecture registration. The architect will visit the factory site, take detailed measurements, understand your manufacturing process, and assess the terrain, soil conditions, and surrounding infrastructure to prepare compliant plans. IncorpX can connect you with experienced industrial architects in Bhubaneswar.
Step 2: Prepare Plans as per Factories Act & NBC
The architect prepares all six required plan types - site plan, building plan, machinery layout, ventilation plan, fire escape plan, and drainage plan - ensuring compliance with Sections 11-20 of the Factories Act and the National Building Code specifications. Each plan is drawn to the prescribed scale and includes all mandatory details as specified in the State Factory Rules.
Step 3: Obtain NOCs from Relevant Authorities
Procure No Objection Certificates from the State Pollution Control Board (Consent to Establish), Fire Department (fire safety clearance), Municipal Authority (land use and zoning clearance), and other departments as applicable to your factory type and location in Bhubaneswar. NOC procurement can take 7-15 days and should be initiated early.
Step 4: Submit Application to Chief Inspector of Factories
File the Factory Plan Approval application with the Chief Inspector of Factories along with all plans, NOCs, structural stability certificates, architect credentials, land ownership documents, and prescribed government fees. The application is submitted through the State's online factory portal or in physical form as required by the respective state.
Step 5: Inspection & Modifications
The Factory Inspectorate reviews the submitted plans and may conduct a site inspection to verify ground conditions. If any modifications are required - such as changes to ventilation openings, exit widths, or machinery spacing - the architect revises the plans accordingly and resubmits for approval. IncorpX coordinates all inspector interactions on your behalf.
Step 6: Receive Factory Plan Approval
Upon satisfactory review of all plans, documents, and NOCs, the Chief Inspector issues the Factory Plan Approval certificate. This approval authorises commencement of construction strictly as per the sanctioned plans. The approval certificate is typically valid for 2-3 years from the date of issue.
Step 7: Commence Construction & Apply for Factory License
Begin factory construction strictly as per the approved plans - any material deviation requires fresh approval from the Chief Inspector. Once construction is complete, apply for a Factory License under Section 6(1) before commencing any manufacturing operations. IncorpX also assists with Factory License application as a continuation of our service.
Get your Factory Plan Approved in 15-30 days with IncorpX!
Timeline Note: The entire process from architect engagement to approval typically takes 30-60 days, depending on the complexity of the factory and the number of NOCs required. IncorpX's parallel processing approach - where we begin NOC procurement while plans are being prepared - significantly reduces the overall timeline.
What Are the Documents Required for Factory Plan Approval in Bhubaneswar?
A comprehensive set of documents must be submitted alongside the Factory Plan Approval application. Here is the detailed list of documents required for Factory Plan Approval:
Incomplete documentation is the primary cause of application rejection and delays. We recommend using IncorpX's document preparation service to ensure every requirement is met before submission to the Chief Inspector's office.
Category
Document Type
Specific Details
Purpose
Site & Building Plans
Site Plan (1:500)
Boundaries, roads, setbacks, open spaces, adjoining properties
Establishes factory location and layout within the site
Compliance with fire safety provisions (Section 38)
Drainage Plan
Effluent disposal, sewage system, waste treatment, storm water drainage
Waste disposal compliance (Section 12)
Structural Certificates
Structural Stability Certificate
Certified by licensed structural engineer with load calculations
Structural safety as per NBC Part 6
NOCs
Pollution Control Board NOC
Consent to Establish from State Pollution Control Board
Environmental clearance for factory operations
Fire Department NOC
Fire safety clearance from State Fire Services
Confirms fire safety compliance of building design
Land Use Clearance
Municipal authority certificate confirming industrial zoning
Verifies factory is in a permitted industrial zone
Ownership & Legal
Land Ownership Proof
Sale deed, lease deed, allotment letter from industrial authority
Establishes legal right to construct on the land
Entity Documents
Certificate of Incorporation, Partnership Deed, Board Resolution
Identifies the legal entity applying for approval
Pro Tip: Maintain multiple copies of all documents - both physical and digital. The Chief Inspector's office retains original plans and NOCs. You will need copies for the subsequent Factory License application, bank financing, insurance, and your own records. IncorpX provides a complete digital document management package with every engagement.
Benefits of Factory Plan Approval in Bhubaneswar:
Factory Plan Approval is not just a legal formality - it provides significant advantages for factory owners, workers, and the business as a whole. Here's why obtaining approval should be your first step:
Legal Compliance
Operate your factory without fear of penalties, demolition orders, or prosecution under the Factories Act. Complete statutory compliance from day one.
Factory License Prerequisite
Approved factory plan is mandatory for obtaining a Factory License under Section 6(1). Without it, you cannot legally commence manufacturing operations.
Worker Safety
Ensures the factory building meets all health, safety, and welfare standards - protecting workers from occupational hazards and ensuring a safe working environment.
Banking & Finance
Banks and financial institutions require approved factory plans for disbursing construction loans, project financing, and industrial term loans.
Government Incentives
Eligible for state industrial subsidies, capital investment incentives, and MSME benefits that require proof of approved factory plans and valid Factory License.
Insurance & Liability
Industrial insurance policies require proof of approved factory plans. In case of accidents, approved plans demonstrate due diligence and limit owner liability.
Beyond these direct benefits, an approved factory plan also serves as evidence of due diligence during regulatory audits, labour inspections, and environmental compliance reviews. It demonstrates to all stakeholders - including investors, customers, and government agencies - that your factory has been designed and built to the highest standards of safety and compliance.
Join 3,000+ factory owners who trust IncorpX!
Penalties for Non-Compliance with Factory Plan Approval in Bhubaneswar:
The Factories Act prescribes severe penalties for constructing or operating a factory without an approved plan. Understanding these consequences underscores the importance of obtaining proper approval before any construction activity:
Violation
Penalty
Additional Consequences
Construction without approved plan
Fine up to ₹2,00,000 (first offence)
Stop-work order, demolition of unauthorized structure
Repeat offence - unapproved construction
Fine up to ₹5,00,000 + imprisonment up to 2 years
Criminal prosecution, permanent blacklisting
Deviation from approved plans
Fine + mandatory plan revision
Construction halt until revised plans are approved
Operating factory without Factory License
Fine up to ₹1,00,000
Closure order, prosecution of occupier and manager
False declaration in plan application
Plan cancellation + criminal prosecution
Blacklisting, disqualification from future applications
Failure to display approval certificate
Fine up to ₹25,000
Warning notice, show cause for license suspension
Obstructing Factory Inspector
Fine up to ₹50,000 + imprisonment up to 6 months
Criminal case, enhanced scrutiny of all future applications
Why Choose IncorpX for Factory Plan Approval in Bhubaneswar?
End-to-End Service: From architect engagement to Chief Inspector approval - we handle everything.
Transparent Pricing: All-inclusive packages starting at ₹14,999. No hidden charges.
Fast Processing: 97% first-time approval rate with 15-30 day turnaround.
Expert Team: Licensed architects, structural engineers, and factory compliance consultants.
Pan-India Coverage: Factory Plan Approval services across all states and industrial zones.
Post-Approval Support: Factory License application guidance and ongoing compliance advisory.
FAQs on Factory Plan Approval in Bhubaneswar:
Understanding Factory Plan Approval requirements can be complex due to multiple statutory provisions and technical specifications. We've compiled answers to the most frequently asked questions to help you navigate the process confidently.
Whether you're setting up a new factory or extending an existing one, these FAQs cover everything you need to know about Factory Plan Approval in India.
Factory Plan Approval is the formal sanction granted by the Chief Inspector of Factories under Section 6 of the Factories Act, 1948. It authorises the construction, extension, or structural modification of a factory building after verifying that the proposed plans comply with all health, safety, and welfare provisions.
The Chief Inspector of Factories (or the State Factory Inspectorate) is the competent authority for approving factory plans. The application is submitted to the Chief Inspector's office in the respective state where the factory is proposed to be established.
Factory Plan Approval is required before constructing a new factory building, extending an existing factory, making structural alterations, or converting any building for use as a factory. No construction activity can legally commence without this approval.
Factory Plan Approval is obtained before construction - it sanctions the building plans. Factory License is obtained after construction is complete - it permits manufacturing operations. Plan approval is a prerequisite for obtaining the Factory License under Section 6(1).
A complete application requires six types of plans: site plan (1:500), building plan (1:100), machinery layout plan (1:100 or 1:50), ventilation plan (1:100), fire escape plan (1:100), and drainage plan (1:200). All plans must be prepared by a licensed architect.
Each plan type has a prescribed scale: site plan at 1:500, building plan at 1:100, machinery layout at 1:100 or 1:50, ventilation plan at 1:100, fire escape plan at 1:100, and drainage plan at 1:200. Plans not drawn to prescribed scales will be rejected.
Under the Factories Act, ventilation openings must cover a minimum of 15% of the floor area, and natural lighting through glazed windows must be not less than 1/6th of the floor area. These requirements ensure adequate air circulation and visibility for worker health and safety.
Factory plans must include a minimum of 2 emergency exits on opposite sides, each at least 1.0 metre wide. Fire escape routes, staircase details, and fire extinguisher positions must be clearly marked. A Fire Department NOC is mandatory before approval is granted.
The Factory Plan Approval process typically takes 15-30 days from the date of complete application submission. Complex cases involving multiple NOCs or revisions may take longer. IncorpX ensures faster processing through proper documentation and proactive follow-up.
Government fees for Factory Plan Approval vary by state and factory size. Professional charges for architect coordination, plan preparation, and application filing are additional. At IncorpX, our all-inclusive package starts at ₹14,999 covering consultation, coordination, and filing.
Key documents include all six types of plans prepared by a licensed architect, structural stability certificate, NOCs from Pollution Control Board, Fire Department, and Municipal Authority, land ownership proof, and entity registration documents. A detailed checklist is provided during consultation.
Constructing a factory without approved plans attracts fines up to ₹2,00,000 for the first offence. Repeat offenders face fines up to ₹5,00,000 and imprisonment up to 2 years. Authorities can also order demolition of the unauthorized structure.
Factory Plan Approval is typically valid for 2-3 years from the date of issue. Construction must be completed and the Factory License obtained within this period. If construction is not completed, a fresh application for plan approval may be required.
Yes, but any material deviation from approved plans requires fresh approval from the Chief Inspector. Minor modifications may be accommodated through an amendment application. Construction must always adhere to the approved plans to avoid penalties.
The Chief Inspector of Factories is the statutory authority responsible for approving factory plans, issuing Factory Licenses, conducting inspections, and enforcing compliance with the Factories Act. All factory plan applications are scrutinized and approved by this office.
Factory plans must include separate latrines and urinals for male and female workers as per prescribed ratios under Sections 19 and 20 of the Factories Act. Adequate ventilation, water supply, and maintenance provisions for sanitary facilities must be shown in the plans.
Yes, NBC compliance is mandatory for all factory buildings. The National Building Code prescribes standards for structural stability, fire and life safety, electrical installations, plumbing, and accessibility. Plans not conforming to NBC standards will not be approved by the Chief Inspector.
Yes, a Consent to Establish from the State Pollution Control Board is required for Factory Plan Approval. This NOC confirms that the proposed factory's emissions, effluents, and waste management systems comply with environmental norms prescribed under the Water Act and Air Act.
Many states now offer online application through their Factory Inspectorate portals. The process involves uploading plans in prescribed digital formats, submitting NOCs, and paying fees online. IncorpX handles the complete online submission process on your behalf.
IncorpX provides end-to-end Factory Plan Approval services including architect coordination, plan preparation review, NOC procurement, application filing, Chief Inspector submission, inspection coordination, and approval certificate delivery. Our experts ensure first-time approval with complete compliance.
The team was very responsive and helpful. I received daily updates from the WhatsApp group, and their guidance made everything much simpler to comprehend. If you want a simple and hassle-free way to launch your business, I would highly recommend them!
S
Simon Job
4.9/5
I recently used IncorpX to register my limited liability partnership, and I had an amazing experience! There were no hidden fees, and the team was helpful, quick to respond, and open. They provided thorough explanations of each step, and their services are reasonably priced without sacrificing quality. The entire process was made simple by IncorpX's professionalism, attention to detail, and sincere support. Strongly advised!
J
Jay R
4.8/5
The experience was flawless; the team completed each task with care and always responded quickly. Throughout the process, I never felt stuck. We would especially like to thank Saksham and Sriram for making everything run so smoothly! The IncorpX team offers extremely competitive pricing; anyone just starting out should definitely get in touch with them.
M
Mohammed Affan
4.9/5
I'm really grateful to the wonderful team at IncorpX for helping bring my co-founder's and my dream to life. The whole process was super smooth - fast service, great support, and no hassles at all. I'd highly recommend IncorpX to any new entrepreneur or founder looking to register their company. Excited to continue working with them in the long run. Thank you, IncorpX!
R
Riyom Taipodia
4.6/5
One of the best agency I have ever experienced. Team members are very friendly as if we know each other from before and came communicate and share easily. My work has been done in a very short period and I am so happy. Thank you so much.
A
Ayyappa Swamy
5/5
Highly recommend... IncorpX services regarding incorporation of our company and roc filing and all are very impressive.. the team IncorpX is polite and friendly. Our Lands Time pvt ltd has incorporated through IncorpX... And thanks to IncorpX team..
R
Ramesh Babu
4.9/5
Trouble free service, Rendering good co-operation for company incorporation. Trust worthy team to have better knowledge.
P
Pravesh Kudesia
5/5
IncorpX is providing best service... And user experience! Thank You IncorpX Team
B
Balaji Gutte
4.9/5
I recently got my Private Limited Company incorporated through IncorpX, and the experience was seamless! The team was professional, supportive, and quick to respond throughout the process. Highly recommend IncorpX for a smooth and stress-free company registration experience.
D
Dia
5/5
I'd been planning to register my Private Limited Company for months but didn't know where to start - until I found IncorpX. The team guided me step by step, explained everything clearly, and completed the registration smoothly within the promised timeline. Their pricing was transparent with no hidden charges. Highly recommend IncorpX to anyone starting a business!
Trusted by 15,000+ Entrepreneurs
Get Expert Guidance for Your Business
Fill out the form and our team will connect with you to understand your requirements and recommend the best way forward.